New build construction of a 5-bedroom home with a separate garage and studio
Project Information
Time Frame
2021
Project
New Build Detached 5-Bedroom House
Location
South England
Submit the form to learn more
Speak to the N&J team
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Project Brief
We were approached by the client who was looking to demolish his existing 1960s bungalow and replaced with a new home located within a conservation area.
The design brief included gaining approval for the demolition and new build construction of a 5-bedroom home with a separate garage and studio.
Project Details
Design, Planning and Conservation area approval
Traditional design proposal to meet with LAs design code.
Demolition of the existing structure
New services including mains drainage.
Traditional cavity wall construction with additional insulation layers internally
Whole house heat recovery
Air source heat pump and underfloor heating
Key Stats
48 Weeks Construction Period
Instantaneous waste collection (no skips or site storage of waste and debris)